Deck finishes fail here faster than the label on the can suggests, and the reason is sun rather than water. A deck in the Columbia Basin takes long, intense summer exposure with very little cloud cover, and UV is what breaks down a finish film and greys the wood fiber underneath it. A product rated for several years in a mild, overcast climate will not deliver those years on a south-facing deck here. That is why we set the re-coat interval by exposure rather than by the manufacturer's number, and why two decks on the same street can be on genuinely different schedules depending on which way they face and how much afternoon shade they get. Refinishing properly means getting back to sound wood first. Applying new stain over a failed coat traps the old finish and the greyed fiber underneath, and the result looks acceptable for one season and then peels in sheets. Stripping and sanding is the part that determines whether the job lasts, and it is also the part most often skipped. The other thing a refinishing visit produces is an honest read on whether the deck is worth refinishing at all, because a sound frame under tired boards is a very different situation from tired boards over a failing frame.
We assess board condition and finish adhesion first, then strip or sand as the surface requires rather than to a fixed spec. Cleaning, drying time and application all get scheduled around weather, because stain applied to damp wood or in high heat will not cure properly. You get a written scope covering surface prep, product and the re-coat interval we would expect for your deck's exposure. Refinishing done in spring or early fall gives better cure conditions than mid-summer, and we will tell you if waiting a few weeks produces a better result.

Removing failed finish and greyed surface fiber down to sound wood.
Re-coating with a finish rated for sustained high-UV exposure and surface heat.
Setting a realistic re-coat interval for your deck's sun exposure and board type.
Proudly serving Kennewick, Richland, West Richland, Benton City, Burbank and Prosser for 10+ years.
Ten deck services, split by scope rather than by marketing. A board replacement and a full tear-out sit on different permit paths and different timelines, so they get separate pages. Start with the one that matches the deck you actually have.

Five towns near Kennewick get regular work from us, and none of them permit a deck the same way. The authority changes, the electric utility changes, and in one case there is no city hall at all. We sort that out before the drawing, not after the inspection.
Frequently Asked Questions
Deck Contractor can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
Deck work in the Kennewick area generally runs somewhere between $15 and $45 per square foot, and the material is what moves you across that range. Pressure-treated framing and decking sits at the lower end, composite at the upper end. Height above grade, whether footings can go where the old ones were, and whether railing and stairs are included move it further. We price after the walkthrough, because the framing under a deck decides the cost more than the boards on top of it.
Most residential decks in Kennewick need a building permit, and it goes through the Building Safety Division at City Hall on West 6th Avenue. Even where a permit is not triggered, the zoning rules under Kennewick Municipal Code Title 18 still apply, so setbacks and easements govern where the deck can sit. We confirm both before drawing anything. If your project is outside the city limits, a different desk handles it.
Plan review on a complete submittal typically takes about ten business days, and that runs before any building starts. After that the schedule follows the footing and framing inspection sequence, the size of the deck, and lead times on your decking and railing. A straightforward rebuild on existing footings and a new elevated deck with stairs are not comparable jobs. We give you a sequence at the walkthrough rather than a single number.
There is no single best board, but the local conditions narrow it fast. Summer surface temperatures run past 100 degrees with heavy sun, so UV stability matters more here than rot resistance does in wetter parts of the state. Composite holds color and needs no refinishing, but it gets hotter underfoot in full afternoon sun. Pressure-treated wood costs less up front and needs re-staining on a cycle, so shade, budget and how much maintenance you want are what actually decide it.
Wood is a board that needs cleaning and re-staining on a regular cycle and will grey and check if it does not get it. Composite is a wood-and-polymer board that does not take stain, holds its color far longer, and costs more per square foot at install. In this climate the practical trade is maintenance against surface heat: composite saves you the refinishing cycle but runs warmer barefoot in July.
We work Kennewick plus Richland, West Richland, Benton City, Burbank and Prosser. Those towns do not share a permit process, and Burbank is not even an incorporated city, so its permits route through Walla Walla County instead. Tell us the address when you call and we will tell you which desk your project answers to.
Surface area sets the baseline and the condition of the existing finish moves it. A deck that needs full stripping and sanding is substantially more work than one that only needs cleaning and a re-coat. Railing adds more linear surface than most people expect. We measure and assess adhesion at the visit before quoting.
More often than the product label suggests, because of the sun load here. A south or west-facing deck with no cover runs on a noticeably shorter cycle than a shaded one. Rather than give you a single number, we look at your exposure and set an interval you can plan around.
Only where the existing coat is still sound and compatible. Where it has started to peel, flake or grey, coating over it traps the failure underneath and the new finish lifts within a season. We test adhesion before deciding, and if it fails the test we strip rather than pretend otherwise.
No. Composite does not take stain and does not need a finish cycle, which is one of the main reasons people choose it here. It still benefits from periodic cleaning, particularly where dust and pollen build up in the board texture. If you have composite and someone has offered to stain it, get a second opinion.
Book Kennewick Deck Refinishing
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Deck Contractor needs.
Ready to hear more about expert services at Kennewick Deck Contractors?
Contact us today to receive a detailed, no-obligation quote.

Serving Canyon Lakes, Southridge, Hansen Park, Cherry Creek, Ridgeline, West Kennewick & Greater Kennewick
Mon–Fri: 7:00 AM–5:00 PM | Sat: 8:00 AM–2:00 PM | Sun: Closed