Wood is still the most common decking choice here, and it remains a sound one as long as the maintenance cycle is understood before the deck is built rather than discovered afterward. The trade is straightforward: a wood deck costs meaningfully less to install than a composite one and requires stripping and re-staining on a repeating basis for as long as you own it. In this climate that cycle is shorter than the product labels suggest, because the summer UV load here is heavy and sustained and UV is what breaks a finish film down. A homeowner who wants a deck and never wants to think about it again is usually happier in composite. A homeowner who is comfortable with a weekend of maintenance on a cycle gets a warmer-looking deck for less money. Wood also runs cooler underfoot than dark composite in full afternoon sun, which matters more here than it does in most markets. The build details that determine how long a wood deck lasts are mostly invisible: fasteners and hardware compatible with treated lumber so the connections do not corrode ahead of the boards, adequate gapping so the deck can move and dry, and ventilation under the frame. Those get specified at the framing stage or not at all.
We walk the site, confirm footing locations against the local frost depth, and go through the wood options with their real maintenance intervals rather than the label figures. You get a written scope covering species, framing, hardware and fastener specification, plus the finish cycle we would expect for your deck's exposure. Where a client is weighing wood against composite, we price both at the walkthrough so the comparison is a real one rather than a guess. Wood decks book most heavily from spring, so winter scoping generally means a better build slot.

The lowest-cost build, with a re-staining cycle set by sun exposure.
Better dimensional stability and appearance at a higher material cost.
Hardware matched to treated lumber so connections do not corrode early.
Proudly serving Kennewick, Richland, West Richland, Benton City, Burbank and Prosser for 10+ years.
Ten deck services, split by scope rather than by marketing. A board replacement and a full tear-out sit on different permit paths and different timelines, so they get separate pages. Start with the one that matches the deck you actually have.

Five towns near Kennewick get regular work from us, and none of them permit a deck the same way. The authority changes, the electric utility changes, and in one case there is no city hall at all. We sort that out before the drawing, not after the inspection.
Frequently Asked Questions
Deck Contractor can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
Deck work in the Kennewick area generally runs somewhere between $15 and $45 per square foot, and the material is what moves you across that range. Pressure-treated framing and decking sits at the lower end, composite at the upper end. Height above grade, whether footings can go where the old ones were, and whether railing and stairs are included move it further. We price after the walkthrough, because the framing under a deck decides the cost more than the boards on top of it.
Most residential decks in Kennewick need a building permit, and it goes through the Building Safety Division at City Hall on West 6th Avenue. Even where a permit is not triggered, the zoning rules under Kennewick Municipal Code Title 18 still apply, so setbacks and easements govern where the deck can sit. We confirm both before drawing anything. If your project is outside the city limits, a different desk handles it.
Plan review on a complete submittal typically takes about ten business days, and that runs before any building starts. After that the schedule follows the footing and framing inspection sequence, the size of the deck, and lead times on your decking and railing. A straightforward rebuild on existing footings and a new elevated deck with stairs are not comparable jobs. We give you a sequence at the walkthrough rather than a single number.
There is no single best board, but the local conditions narrow it fast. Summer surface temperatures run past 100 degrees with heavy sun, so UV stability matters more here than rot resistance does in wetter parts of the state. Composite holds color and needs no refinishing, but it gets hotter underfoot in full afternoon sun. Pressure-treated wood costs less up front and needs re-staining on a cycle, so shade, budget and how much maintenance you want are what actually decide it.
Wood is a board that needs cleaning and re-staining on a regular cycle and will grey and check if it does not get it. Composite is a wood-and-polymer board that does not take stain, holds its color far longer, and costs more per square foot at install. In this climate the practical trade is maintenance against surface heat: composite saves you the refinishing cycle but runs warmer barefoot in July.
We work Kennewick plus Richland, West Richland, Benton City, Burbank and Prosser. Those towns do not share a permit process, and Burbank is not even an incorporated city, so its permits route through Walla Walla County instead. Tell us the address when you call and we will tell you which desk your project answers to.
It depends far more on the framing and the finish cycle than on the decking species. A wood deck with footings set below frost depth, corrosion-compatible hardware and a maintained finish lasts a long time. One with shallow footings and a lapsed finish shows its age fast. The maintenance is what determines the outcome.
Pressure-treated costs less and is the most common choice. Cedar is more dimensionally stable, looks better, and costs more per board. Both need the same finish cycle in this sun. If budget is the constraint the answer is usually pressure-treated framing with the species decision made on the decking alone.
Generally not. Wood runs cooler underfoot than dark composite in direct afternoon sun, which is a real consideration here in July and a genuine argument for wood around pools and on unshaded south-facing decks. Lighter composite colors close some of that gap but do not eliminate it.
Hardware and fasteners have to be rated for contact with treated lumber, because the treatment chemistry corrodes incompatible metal. When that gets it wrong the connections fail while the boards still look fine, which is a frustrating and avoidable failure. We specify compatible hardware as a matter of course.
Plan Your Kennewick Wood Deck
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Deck Contractor needs.
Ready to hear more about expert services at Kennewick Deck Contractors?
Contact us today to receive a detailed, no-obligation quote.

Serving Canyon Lakes, Southridge, Hansen Park, Cherry Creek, Ridgeline, West Kennewick & Greater Kennewick
Mon–Fri: 7:00 AM–5:00 PM | Sat: 8:00 AM–2:00 PM | Sun: Closed